CSI FilmTech²
The CSI FilmTech² Spray System Developed to replace older out of date spray systems.
FilmTech² has many functions available as standard and can be used with up to 6 Nozzles.
Latest News from Coating Systems International (CSI)
CSI FilmTech²
The CSI FilmTech² Spray System Developed to replace older out of date spray systems.
FilmTech² has many functions available as standard and can be used with up to 6 Nozzles.
A TechniCota® LAB being shipped to a customer with some bespoke modifications to meet customer requirements.
Coating systems are always flexible to meet customer needs.
CSI have been supplying tablet coating machines with indirect gas heating for many years but, coupled with our heat recovery system, we believe it’s the most energy efficient coater on the market.
A typical process time of 1.5 Hours for a 350Kg batch size would require inlet air heated to 65°C from a nominal 10°C outside air temperature; this 55°C heat rise would need 100kW of energy with airflow of 5500 m3/hr. The heat recovery gives up to 40% so the first saving is 40kW.
That may not sound like a lot of energy but then add the fact that when not in use it is using 0kW unlike steam which constantly uses energy with or without the process running.
Then add the cost of chemicals to keep the steam in a good condition.
Electric is an option and you can still get a 40% saving but the energy usually costs 3 x that of gas.
We have many videos on YouTube not all are on the website this is an old video but still relevant
Thompson and Capper
“Coating Systems International Ltd have been a long standing and trusted supply chain partner. We find their ‘turn key’ approach reduces on site interfaces from submission of RAMS through to detailed completion of validation documentation which is paramount as part of our corporate compliance”.
Matthew Dyal
Managing Director / Operations Director
Thompson & Capper Ltd
Time-lapse Video of Coating machine delivery to site.
CSI have been asked to manufacture a Dispensing Bench to allow for 3 levels of use
Top shelf for documentation
Middle shelf for materials
Bottom shelf to house a weight platform
Designed with integral dust extraction and all to a very high cGMP standard for cleaning
After completion of a comprehensive Factory Acceptance Testing protocol (FAT),
Another Tablet Coating Machine is dispatched to site for installation,
CSI will manage the complete installation.
Another tested Coating machine with its inlet unit.
The inlet is indirect gas heated with heat recovery.
Aspar
“We instructed CSI to design, build, install, commission and Validate our new tablet coating machine, in summary the execution of this project was seamless due to consistent lines of communication between CSI’s Project Manager and our team, on the basis of our experience we would have no hesitation in recommending CSI’s equipment and turnkey service”.
Tom Burke
Aspar Pharmaceuticals Ltd